Pozzolana Drier Project

Client: Bamburi Cement Ltd
Engineer: Gibb Africa Ltd
Type: Design & Construct on turnkey basis
Duration: May 2008 to October 2008

Scope of Works:

Design and construction of the drier concrete foundations
This work includes:

  • Excavation works (700m3). 
  • Class 30 Concrete works (600m3). 
  • Steel Reinforcement works (71 Ton)
  • Supply and grouting of Anchoring bolts