65m High Wind Mast at Ngong Hills

Client: Prunus Energy Systems
Type: Turnkey
Duration: November 2009 - December 2009

Scope of Works:
Installation of a 65m high Wind Mast at Ngong hills (Corner Baridi).
The work included the following:

  • Supply and install 65m tall Guyed Lattice Tower
  • Foundation works for the mast
  • Provision and installation of Data Loggers, 
  • Provision and installation Anemometers,
  • Provision and installation Wind Direction Vanes
  • Provision and installation Temperature sensor
  • Provision and installation of the equipments accessories
  • Construction of a guard house, toilet and fencing
  • Testing and commissioning

80m High Wind Mast in Marsabit

Client: Gitson Energy Ltd
Type: Turnkey
Duration: December 2009 to January 2010

Scope of Works:
Installation of an 80m high Wind Mast at Marsabit (Bubisa)
The work included the following:

  • Supply and install 80m tall Guyed Lattice Tower
  • Foundation works for the mast
  • Installation of Data Loggers
  • Installation Anemometers
  • Installation Wind Direction Vanes
  • Installation Temperature sensor
  • Installation of the equipment accessories

Relocation of a 50m High Wind Mast in Marsabit

Client: Kengen
Type: Sub-Contract
Duration: September 2010

Scope of Works:
Relocation of an existing 50m high Wind Mast at Marsabit
The work included the following:

  • Dismantling, transport and re-erection of the mast
  • New foundation works for the mast
  • Dismantling and re-installation of Data Loggers
  • Dismantling and re-installation Anemometers
  • Dismantling and re-installation Wind Direction Vanes
  • Dismantling and re-installation Temperature sensor
  • Dismantling and re-installation of the equipment accessories